Sydney Aquatic Center
Location Sydney, Australia
Completed 2022
Category Public
Scale Olympic training facility with 3 pools
Challenge
Public facility with high bather loads required robust sanitization and rapid turnover filtration. Strict health department compliance was mandatory.
Solution
Multi-unit redundant systems ensure continuous operation even during maintenance. Advanced ozone/UV secondary treatment with automated chemical monitoring.
Result
100% compliance record with health inspections. The redundant design means zero downtime for maintenance. Energy costs are 35% below comparable facilities.
Equipment Supplied
Inverter Heat Pump HP-30
Olympic pool heating
Qty: 4Commercial Pump CP-5HP
High-flow circulation
Qty: 6Commercial Filter CF-48
Rapid filtration
Qty: 4"We host national competitions and cannot afford any equipment failures. The redundancy built into this system gives us complete confidence."